Pipes and Tanks

Sewers

  • Water-blocking
  • Non-disruptive
  • Prevents rodents

Our hardfoam solutions for decommissioning redundant pipes and sewers are designed to be flexible, fast and non-intrusive.

Unlike labour intensive methods our team expertly inject the foam using a single access point, ensuring that the sewer is swiftly decommissioned with minimal impact to the surrounding environment.

Besides being easily implemented the foam is also an effective physical barrier. During the process the sewer is firmly stabilised and sealed preventing washouts, gas buildups and rodents from occurring.

 

Our process

  1. Quote

    We'll request the project specifications, such as pipe length, diameter and the location, and then you'll be sent our quote – usually on the same day!

  2. Preparation

    Filling and venting points need to be decided on and made.
Before we start filling we'll do an 'air-check' to make sure we are using the correct access points.

  3. Filling

    Our technical specialist will fill the pipe with our hardfoam in the recommended density, which is often pre-determined by the commissioning party.

  4. Completion

    You'll receive a confirmation of completion along with any required documentation.

Frequently asked questions

Do you have a question about this type of service? Drop us a message if you can’t find what you’re looking for, we’d be happy to provide you an answer

Get in touch

One of our specialists will reply within 1-2 business days.
Not a bot or ai-chat, a real person who can tell you more about what you want to know!

 

Hardfoam Team

Technical Specialists

+31 (0)487 593 778 info@benefil.nl