Structural Stabilisation

Floor lifting

  • Water based
  • No excavation
  • Fast curing

When pipelines, sewer lines, fuel tanks or storage vessels go out of service, leaving them empty creates risk. Subsidence, groundwater contamination, fire hazard. We fill them with water-based hardfoam that is fast-curing, low-emission and fully traceable.

Site-mixed and injected through existing access points or small openings. No excavation, no fuel residues, no environmental hassle. The asset is rendered inert and structural within hours.

Our Process

  1. Site visit

    One of our team will visit the site to records measurements and specifications. If our operator judges that our floor lifting services are not an appropriate solution for your project then you will be informed.

  2. Quote

    A quote will be tailored to the specifications of the project and following a site visit by one of our specialists. You can decide when you want to reply.

  3. Floor preparation

    Depending on the floor type and thickness our team will decide where and how many holes will need to be drilled.

  4. Filling

    Firstly we'll fill all voids that are under the floor. Once these have been filled we can begin to lift the floor. For this we use laser levelling equipment to monitor its progress.

  5. Completion

    After filling is completed the injection plugs are removed and the drilled holes will be sealed, then we'll send you confirmation of the completed job.

Frequently asked questions

Desperately searching for answers about floor lifting? Drop us a message if you can’t find what you’re looking for, we’d be happy to help you!

Get in touch

One of our specialists will reply within 1-2 business days.
Not a bot or ai-chat, a real person who can tell you more about what you want to know!

 

Hardfoam Team

Technical Specialists

+31 (0)487 593 778 info@benefil.nl